Determine The Installation Location Of The Submersible Mixer.

Determining the installation location of a submersible mixer hinges on a comprehensive assessment of the pool structure, water flow requirements, and treatment process. Here are the specific methods:

I. Factors for Selecting the Installation Location

**Pool Shape and Depth:**
* **Circular Pool:** Suitable for symmetrical installation to ensure even water flow distribution.
* **Rectangular Pool:** Diagonal layout or multiple units connected in series is recommended to avoid dead zones.
* **Water Depth Exceeding 3 Meters:** Layered mixing is necessary to prevent bottom sediment buildup.

**Equipment Installation Height:**
* The impeller should be 30-50 cm from the pool bottom. Too close, and sludge may be sucked in, causing blade wear; too far, and the bottom agitation effect will be weakened.

**Mixed Solution Concentration:**
* When the mixed solution concentration exceeds 8%, the installation angle needs adjustment. A 5-10 degree tilt can enhance the agitation effect.

**Multiple Unit Collaboration:**
* The distance between adjacent units should be no less than 1.5 times the effective mixing radius to prevent water flow interference.

II. Inlet/Outlet Water Direction Matching Principles

Water Flow Direction and Impeller Rotation Direction:

Clockwise rotating equipment should be placed on the right side of the inlet, and counterclockwise equipment on the left side, utilizing fluid dynamics to improve mixing efficiency.

Outlet Location:

It is recommended to place the outlet at 2/3 of the agitator's effective radius to ensure uniform distribution of suspended solids and avoid short-circuiting.

High Viscosity Liquid Treatment:

The height difference between the inlet and outlet should be controlled within the range of 0.8-1.2 meters. Excessive height difference will cause vortex cavitation.

Special Process Requirements:

The inlet and outlet orientations in the nitrification/denitrification zones need to be adjusted according to dissolved oxygen distribution. Generally, the inlet faces the upper oxygen-rich zone, and the outlet faces the lower anoxic zone.

III. On-site Operation Precautions

Flange Connections:

Double-layer waterproof gaskets must be used. Apply sealant before tightening the bolts.

Cable Mounting Bracket:

Anti-vibration rubber pads should be installed at the contact points with the pool wall. If the vibration amplitude exceeds 0.5 mm, the position needs to be recalibrated.


Commissioning Phase:

First, perform a short test run to confirm the direction of rotation and observe whether the water flow trajectory matches the design flow pattern.


After 72 Hours of Operation:

Check for displacement of the mounting brackets. Loose anchor bolts are a common cause of installation misalignment.


Winter Installation:

Allow space for thermal expansion. When the ambient temperature is below 5℃, stainless steel equipment requires extended idling preheating time.


IV. Installation System Selection


Portable Installation System:

Suitable for pool depths less than 4 meters. Models QJB0.85/8 and QJB1.5/6 are available. The angle can be adjusted horizontally and vertically.


Vertical Installation System:

Suitable for pool depths greater than 4 meters. A concrete foundation or steel structure base is required at the bottom of the pool.


Material Selection:

The installation system can be made of stainless steel or corrosion-resistant carbon steel. Customers must provide the pool depth and shape drawing when ordering.

Multiple Mixers:

They can share one lifting system or each mixer can have its own installation system.